Columbus Grove Seal Coat Project
Monday, October 2nd, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Tuesday, October 3rd, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Wednesday, October 4th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Thursday, October 5th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Friday, October 6th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Monday, October 9th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Tuesday, October 10th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Wednesday, October 11th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Warner Channel & Bike Trail Maintenance Notice
Wednesday, October 11th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Grill Master
Wednesday, October 11th, 2017, 7pm at The Grove Pool
Join us for another installment of our Grill Master cooking class series! Chef Syd creates inspired menus for us to taste while showing us how to gourmet it up on the grill.
 
Class size is limited to first 25 residents who sign in at class.
 
Class begins promptly at 7pm, this is an Adult Only event.
 
Warner Channel & Bike Trail Maintenance Notice
Thursday, October 12th, 2017, TBD at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Columbus Grove Seal Coat Project
Thursday, October 12th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Columbus Grove Seal Coat Project
Friday, October 13th, 2017, 7am at Columbus Grove Master Streets
Columbus Grove streets will be undergoing
sealcoating in the upcoming days. Sealcoating
is a preventative maintenance surface
treatment designed to preserve and extend the
life of a street. The application of a
sealcoating will require parking and drive
closures beginning at 7:00am on specified days.
Please click on the links below for the Sealcoating schedules.
We ask that you kindly observe the
dates and times of street and parking closures.

Overnight parking enforcement will be
suspended during the project.
 
 
Warner Channel & Bike Trail Maintenance Notice
Friday, October 13th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Saturday, October 14th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Sunday, October 15th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Monday, October 16th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Tuesday, October 17th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Wednesday, October 18th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Thursday, October 19th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Friday, October 20th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
The Spooktacular
Friday, October 20th, 2017, 6pm to 9pm at The Village Park
Warner Channel & Bike Trail Maintenance Notice
Saturday, October 21st, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Sunday, October 22nd, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Monday, October 23rd, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Tuesday, October 24th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Wednesday, October 25th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Thursday, October 26th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Friday, October 27th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Saturday, October 28th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Sunday, October 29th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Monday, October 30th, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 
Click here for:
Warner Channel & Bike Trail Maintenance Notice
Tuesday, October 31st, 2017, 8am to 4pm at Warner Ave & Columbus Grove
PUBLIC WORKS DEPARTMENT
WARNER CHANNEL AND BIKE TRAIL MAINTENANCE NOTICE
 
 
Dear Columbus Grove Resident:
 
The City of Irvine Public Works Department will be conducting maintenance improvements in the Warner Channel and Warner off-street bike trail.  City staff and City contracted staff will be performing the necessary activities consisting of slope stabilization and bike trail restoration. 
 
Every effort will be made to complete this essential work quickly and with as little inconvenience to your residence and community as possible. Your assistance and cooperation during this project will be greatly appreciated.
 
Location of the Scheduled Work:
 
The Warner Channel and Warner off-street bike trail are located between Warner Ave. and the Columbus Grove community, just NW of the Warner Avenue/Harvard Avenue intersection (see map).   In the interest of public safety, the channel and bike trail will be closed.  The Grove Park pathway, at the corner of Larkspur St. and Jasmine Place, will also be closed at the entry point to the bike trail.
 
Work Schedule:      Slope stabilization and bike trail restoration activities are scheduled to begin Wednesday, October 11, 2017 and are expected to be completed by November 6, 2017.
 
Work Hours:            Monday – Friday from 8 a.m. to 4 p.m. 
 
Access:                     Access to your homes via Harvard Ave. or Edinger Ave. will be maintained throughout the process. Off-street trail users can use the Warner Ave. on-street bike lane that parallels the off-street trail. 
 
 
 
Notification:             The channel and the off-street bike trail will remain closed for the duration of the project.  Closure signs will be posted at the Grove Park pathway, at the corner of Larkspur St. and Jasmine Place.  Closure signs and Detour signs will also be placed on Warner Ave at both trail entry points (just NW of Harvard/Warner intersection and just east of Peter’s Canyon Channel).  Please observe these notices.
 
Please be aware that schedules may be subject to change due to weather conditions or other unforeseen factors. If you have questions or require special accommodations, please call 949-724-7600 or email maintenance@cityofirvine.org.
 
Thank you for your patience and support while we work to improve the channel and bike trail near your community.
 
 
City of Irvine – Public Works Department – Street Maintenance Division
 
 